If you have problems viewing this area please check if you have a flash player installed on your computer. You can get the latest version of flash player here: http://www.adobe.com/shockwave/download/download.cgi?P1_Prod_Version=ShockwaveIf the flash player is installed your browser might be not supporting the js scripts. Enable js in your browser settings.
Project Info

Repair and restoration of severely deteriorated slabs and beams. The internal reinforcing steel was cleaned by sand blasting and a corrosion inhibitor was applied. The existing joists were formed and repaired with polymer modified high performance concrete.   Three layers of Tyfo™ SEH51 E-Glass were applied to the structure externally. By using the Tyfo™ Fibrwrap™ system, the following advantages were realized:

1. Additional confinement, strength, durability, and long-term performance.
2. FRP reinforcement restored operating capacities, and regained original designed functions.
3. Extended service life