Camp Merrill Clearwell FRP

Interior clearwell FRP at Camp Merrill combined engineered reinforcement with surface preparation and controlled installation conditions.

Project overview

Delta Structural Technology completed FRP installation in the Camp Merrill clearwell as part of the Ranger School water-treatment project. The contracted scope covered interior walls and the floor, combining an engineered composite system with an acrylic finish coating. The work required the receiving concrete and the enclosed work area to be prepared for installation and curing.

Market
Military & Government
Services
Clearwell FRP strengthening
Location
Camp Merrill
Inside a domed concrete tank with workers applying composite fabric to the interior wall.

Project challenge

The reinforcement locations were inside the clearwell, placing access and environmental conditions at the center of the field plan. Equipment and obstructions had to be removed before Delta’s work, and the scope treated the areas as confined spaces. The interior wall and floor locations also needed to follow the specific project drawings and the composite design package.

Roller on an extension pole saturating glass fiber fabric on a concrete tank wall.

Project approach

The scope referenced the Army Corps of Engineers water-treatment drawings and Simpson’s clearwell design calculations. It specified composite fabric, epoxy saturant and primer, paste and filler, and an acrylic coating over the FRP. Delta’s installation sequence included concrete preparation by hand grinding, reinforcement layout, and application of the composite system. The submittal package connected those materials and operations to the designed wall and floor locations.

Sweeping curved interior tank wall covered with composite fabric beneath a dome.

Delivery and coordination

Maverick Constructors’ coordination responsibilities included removal of access obstructions, staging space, permits, inspection and testing, and any required dust enclosures. Dry and suitably tempered conditions were required during installation and cure. These arrangements made the environment within the clearwell a planned part of the work rather than a condition left to be resolved during application.

Project significance

Camp Merrill illustrates the coordination needed for composite installation within a water-infrastructure enclosure. The technical focus is the relationship between the engineered wall-and-floor layout, the condition of the concrete, and the environment needed for application and cure. A defined coating layer completed the specified system.